MCA 140 has been repainted

Yesterday when I tried to get into MCA 140 to check the ceiling (because I forgot to photograph it the last time I was there) it was locked. I figure since crits aren’t officially finished until today the room probably would be unlocked today. Sure enough, when I tried to check the room today it was unlocked. But what stuck out was the smell: the smell of fresh paint. The room has been repainted. But why bother to repaint it now if most students doing GradEx are going to repaint their rooms anyway? I’m not saying we’re going to (I really want to if I can figure out how to deal with the air vents and ducts—and of course if I can convince everyone else in my program), but I’m genuinely curious.